Contract TypesSpectrum

Buyer vs. Seller Risk Spectrum

How contract structure allocates cost uncertainty and aligns incentives

Contract StrategyHigh-Yield Exam Topic

Buyer vs. Seller Risk Spectrum

Every procurement contract shifts cost risk between buyer and seller. Buyers generally prefer price certainty when scope is clear; sellers prefer cost protection when scope is uncertain.

  • FFP = Max Seller Risk
  • CPPC = Max Buyer Risk
  • T&M = Hybrid With NTE Cap

Cost Risk Allocation Spectrum

Moving left to right shifts cost overrun risk from the Seller onto the Buyer

Seller Bears Risk (Buyer Price Certainty)Buyer Bears Risk (Scope Flexibility)

Fixed Price (FFP / FPIF / FP-EPA)

Seller Risk

Well-defined scope

  • • FFP locks price; seller absorbs overruns
  • • FPIF shares savings/overruns up to ceiling
  • • FP-EPA adjusts for multi-year inflation

Time & Materials (T&M)

Mostly Buyer Risk

Hybrid rate + materials

  • • Hourly/daily rate × effort + materials
  • • Best for staff aug or urgent starts
  • • Must enforce Not-to-Exceed (NTE) cap

Cost Reimbursable (CPIF / CPAF / CPFF)

Buyer Risk

Uncertain / R&D scope

  • • Buyer pays allowable actual costs + fee
  • • Requires invoice audits & cost tracking
  • • Incentive or award fees guide performance

Cost Plus % of Cost (CPPC)

Extreme Buyer Risk

Highest buyer exposure

  • • Fee equals a % of actual costs spent
  • • Zero incentive for seller cost control
  • • Discouraged / barred in many public procurements